Coal Transfer Tower
Scope of Work: Design and fabrication of coal transfer tower building
Duration: 2 months
Highlights:
- Structural steel detailing
- Fabricate 140,000 lbs of structural steel
- Sandblast and epoxy paint finish
- Shipping to Customer site
Scope of Work: Design and fabrication of coal transfer tower building
Duration: 2 months
Highlights: