Kanaka Creek Pole Mill Expansion
Scope of Work: Installation of New Debarker Line
Duration: 12 months
Highlights:
- Manufacturing and installation of 350,000 lbs of structural steel
- Manufacturing and installation of 800,000 lbs of mechanical log handling equipment
- Design and installation of hydraulic systems
- Design and installation of air systems