Kiln Track Installation
Scope of Work: Installation of Kiln Track
Duration: 1 month
Highlights:
- Manufacturing and installation of 1,200′ of kiln track
- Excavation and concrete work inside 2 kilns
- Full concrete slab replacement for the first kiln
- Replacement of kiln track trenches for the second kiln